Riverdale Park Green Infrastructure FundingThis is a featured page



dwightrholmes
dwightrholmes
Latest page update: made by dwightrholmes , Apr 6 2009, 11:07 PM EDT (about this update About This Update dwightrholmes Edited by dwightrholmes


view changes

- complete history)
More Info: links to this page
Started By Thread Subject Replies Last Post
MSevener Riverdale Park Green Infrastructure 0 Apr 4 2009, 11:33 AM EDT by MSevener
Thread started: Apr 4 2009, 11:33 AM EDT  Watch
The MDE Award List is posted here. Page 2 describes "Green Infrastructure" and on the second page of the tables our project is listed for a grant total of $319,000. Bid Documents must be prepared by July with award in September. Construction must start before December 31, 2009. The grant proposal was prepared by the Center for Watershed Protection and includes a significant public participation component and volunteer work to assist in workshops to design the stormwater retrofits and implement planting. I expect we will discuss this further in the next Public Works Committee meeting, so if you are interested in participating please keep your eye on the agenda for the next meeting and plan on attending.
Do you find this valuable?    
Keyword tags: None
Showing 1 of 1 threads for this page
Adobe Portable Document Format MDE Award List.pdf (Adobe Portable Document Format - 127k)
posted by MSevener   Apr 4 2009, 11:28 AM EDT
MDE Award List

Related Content

  (what's this?Related ContentThanks to keyword tags, links to related pages and threads are added to the bottom of your pages. Up to 15 links are shown, determined by matching tags and by how recently the content was updated; keeping the most current at the top. Share your feedback on Wetpaint Central.)